Supplier sign in
Home
STAY INFORMED
Subscribe to our monthly newsletter.
Your email address will never be disclosed to any third party.
Read our privacy notice.

       

Press release
28.03.2024  |  309x
Share this item

New melting plant for infrastructure cables put into operation

A. Ebbecke Verfahrenstechnik AG has commissioned a new melting plant for the processing of additives in the field of infrastructure overland cable production for an international customer.
The new plant is designed for a capacity of two thousand tons per year and consists of a rinsing plant with deionized water for international transport containers, a drying plant and a melting plant with agitator equipment and container filling plant. The entire plant was built in accordance with the Federal Emissions Directive and is operated in three shifts.
The plant underlines the customer-oriented service of A. Ebbecke Verfahrenstechnik, for which the existing upstream production facilities provide an additional opportunity for customers to initiate business. As a partner to the international chemical industry, A. Ebbecke Verfahrenstechnik is a strategic partner that supports its customers’ business and thus ensures continuous growth for its customers.

The entire facility is operated under Ex conditions and also includes special air-conditioned logistics for the reception of both empty and finished containers to ensure a closed-loop system for its customers in an international context.

Company information

A. Ebbecke Verfahrenstechnik AG
A. Ebbecke Verfahrenstechnik AG
A. Ebbecke Verfahrenstechnik: Sustainable and Innovative Experience, Know-how and Innovations are the basis for modern proces engineering The increasingly flexible requirements, combined with the continuously decreasing market cycle terms, demand for highly flexible and reactive processes for making specific products for our clientele. In order to support our customers in this dynamic market we provide the possibility to outsource, thus variabilizing costs and creating short term capacities and sample lot availability. Investment decisions and planning cycles often require huge amounts of time, hence extending the time-to-market, not allowing for an in-time market introduction. A. Ebbecke Verfahrenstechnik AG will gladly support you in this matter. With our diverse capacities and specific expertise concerning the economic and technical framework, we offer the high flexibility and swift availability our customers are accustomed to. Through cost variabilization, the cost foundation is clear. Meaning: hidden costs, subsequent cost increases or unavailable capacities are risk factors that can be ruled out in advance. By providing the full supply-chain, we offer a comprehensive service allowing short-term market introduction of new products. A. Ebbecke Verfahrenstechnik AG is specialized in developing and accompanying scale-up processes with its customers, leading to investments by A. Ebbecke Verfahrenstechnik AG within a manageable timeframe of 6 – 12 months. Our main objective in doing so is agreeing on long-term contracts with our customers. Investments made are then usually returned over the contract term. The investment risk is split between the parties using an investment formula. Merely 50 % of the overall investment are added to the product cost. The remaining 50% are covered by A. Ebbecke Verfahrenstechnik AG. In exchange the machinery remains the company’s property. This allows a clear cost allocation for maintenance, repairs and replacement, therefore all additional or hidden costs are minimized or fully eliminated.
Last update: 22.04.2022

More items

PORTALS
BulkSolids-Portal Schuettgut-Portal Recycling-Portal
Related
Bulkgids.nl
SIGN UP FOR OUR NEWSLETTER
Newsletter archive
Service and contact
ContactDisclaimerPrivacyAdvertising
FOLLOW US
Linked