Info     Contact     Newsletter     Statistics     Disclaimer     Impressum     Company log-in 
    Show all banners at the same time  
logo schuettgutportal.com
   
 
   

 
 
 
Siloworld, Fachmagazin für Schüttgut- und Silotechnik
 
Siloworld, Fachmagazin für Schüttgut- und Silotechnik
 
Siloworld, Fachmagazin für Schüttgut- und Silotechnik
 
 

Press release

Ground breaking ceremony

Druckversion Send this news to.. Tweet this

10. July 2008

Ground breaking ceremony 10. July 2008 

Less than three years after the first sod was turned for UWT’s four storey office block, there is more building news on the horizon. On 10 July, the next sod was turned to overcome the acute lack of space; this time for a combined production and office building with three levels.

UWT’s agents, customers and not to forget the employees have advanced the success and growth of the company so that the current “new” office building was no longer sufficient for the requirements of the growing enterprise.

The new ecologically compatible building will be constructed using local raw materials and will offer an effective floor space of 2,600 square metres over three storeys. Built according to the passive energy (ultra low energy) standards, it is expected that energy requirements will be far exceeded! Pellet heating and a ventilation system with a heat recovery ventilation system and a solar energy system will supply the necessary energy to be self sufficient.

The production and office building will be connected to the existing production building and is planned to be finished by the end of 2008

More information:     UWT GmbH    
Placed: 09/07/2008 Shown: news 630 x